ONDCP Seal


Counterdrug Technology Assessment CenterCounterdrug Technology Assessment Center
Welcome to the site of the Ten-Year Counterdrug Technology Plan and Development Roadmap.
June 1998
Office of the National Drug Control Policy
Counterdrug Technology Assessment Center
    Director's Message
    Executive Summary

  1. Introduction
  2. Planning Counterdrug Technology Development
  3. Wide Area Surveillance Technologies
  4. Non-Intrusive Inspection Technologies
  5. Tactical Technologies
  6. Demand Reduction Research & Technologies
  7. Implementation
  8. References
  9. Contributions and Consultations
    Appendix: Agency Comments to OMB Clearance
    List of Commonly Used Acronyms

List of Figures

Figure 1. Role of Technology in Counterdrug Efforts

Figure 2. Supply Reduction Process

Figure 3. Demand Reduction Process

Figure 4. Generic Development Roadmap

Figure 5. Wide Area Surveillance Operational Capabilities

Figure 6. Technology Development Roadmap –Wide Area Surveillance

Figure 7. Commercial Vehicle Arrivals & Examinations from Mexico, 1994-1996

Figure 8. Harnessing Technology for Non-Intrusive Inspection Operational Capability

Figure 9. Technology Development Roadmap –Non-Intrusive Inspection

Figure 10. Harnessing Technology for Tactical Operational Capabilities

Figure 11. Technology Development Roadmap –Tactical Technologies

Figure 12. Demand Reduction Components & Functional Relationships

Figure 13. PET System and Drug Application

List of Tables

Table 1. Technology Panel Composition

Table 2. Types of NII System Elements Currently in Use

Table 3. TAC Operational Requirements vs TAC Components

Table 4. Federal Drug Control Spending by R&D Function, FY 97–99

Table 5. Technology Panel Leaders