Welcome to the site of the Ten-Year Counterdrug
Technology Plan and Development Roadmap.
June 1998
Office of the National Drug Control Policy
Counterdrug Technology Assessment Center
Director's Message
Executive Summary
- Introduction
- Planning Counterdrug
Technology Development
- Wide Area Surveillance
Technologies
- Non-Intrusive Inspection
Technologies
- Tactical Technologies
- Demand Reduction Research
& Technologies
- Implementation
- References
- Contributions and
Consultations
Appendix: Agency Comments to
OMB Clearance
List of Commonly Used Acronyms
List of Figures
Figure 1. Role of Technology in
Counterdrug Efforts
Figure 2. Supply Reduction
Process
Figure 3. Demand Reduction
Process
Figure 4. Generic Development
Roadmap
Figure 5. Wide Area
Surveillance Operational Capabilities
Figure 6. Technology Development
Roadmap Wide Area Surveillance
Figure 7. Commercial
Vehicle Arrivals & Examinations from Mexico, 1994-1996
Figure 8. Harnessing
Technology for Non-Intrusive Inspection Operational Capability
Figure 9. Technology Development
Roadmap Non-Intrusive Inspection
Figure 10. Harnessing
Technology for Tactical Operational Capabilities
Figure 11. Technology Development
Roadmap Tactical Technologies
Figure 12. Demand Reduction
Components & Functional Relationships
Figure 13. PET System and
Drug Application
List of Tables
Table 1. Technology Panel Composition
Table 2. Types of NII System Elements
Currently in Use
Table 3. TAC Operational Requirements vs
TAC Components
Table 4. Federal Drug Control Spending by
R&D Function, FY 9799
Table 5. Technology Panel Leaders